Capabilities
A real factory, not a trading desk.
Our Dongguan facility runs molding, painting, printing and assembly in the same building. That is what keeps a 60-day lead time realistic instead of optimistic.
10Roto-casting machines
6Injection machines
3Assembly lines
60Days average lead time

Equipment
Verified production equipment on the floor today.
| Equipment | Model / tag | Qty |
|---|---|---|
| Injection molding machines | XBJH-0935 ~ XBJH-0940 | 6 |
| Roto-casting machines | SJK001 ~ SJK010 | 10 |
| Pad printing machines | ATKL001 ~ ATKL010 | 10 |
Production lines
Each line has its own supervisors and in-line QC.
| Line | Supervisors | Operators | QC / QA |
|---|---|---|---|
| Assembly line 1 | 2 | 20 | 2 |
| Assembly line 2 | 2 | 20 | 2 |
| Painting line | 1 | 30 | 3 |
| Pad printing line | 1 | 5 | 1 |
| Packaging line | 1 | 10 | 1 |
Factory facts
| Plant area | 1,000 – 3,000 m² |
| Production lines | More than 10 |
| Workers | 50+ |
| R&D team | 5 – 10 people |
| Annual output value | US$2.5 – 5 million |
| Contract manufacturing | OEM / ODM |
| Nearest port | Yantian, Shenzhen |
Quality control
Checks happen at the mold, on the paint line and again before packing — not only at final inspection, when it is too late to fix anything.

Incoming & first-article
Resin and pigment checked on arrival; first shots measured against the approved sample.
In-line
Paint coverage and position checked on the line, with dedicated QC per line.
Pre-shipment
Carton drop test, barcode and label verification, quantity audit before loading.